Aerospace & Defense
Aerospace Job Shop
Representative scenario — specific details available upon request for qualified prospects.
40%
Operator time recovered
12
Part families automated
99.2%
On-time delivery (up from 87%)
14 mo
Payback period
Challenge
High-mix environment with frequent changeovers. Skilled operators spending 40% of time on load/unload. Difficulty meeting delivery schedules.
Approach
Flexible FANUC CRX cell with quick-change grippers. Teach pendant programming for operator-led setup. Integration with existing Siemens control.
Outcome
- 40%Operator time recovered
- 12Part families automated
- 99.2%On-time delivery (up from 87%)
- 14 moPayback period
System Overview
Automation Cell
Visual documentation of the deployed system and integration.

“Our machinists now focus on programming and quality instead of standing at the machine.”— Shop Owner
See Similar Results in Your Operation
Every shop is different. Tell us about your process and we'll show you what automation looks like for your specific application.